electric

Results 1 - 25 of 284Sort Results By: Published Date | Title | Company Name
Published By: Schneider Electric     Published Date: Mar 28, 2019
Because electricity is a key commodity for business it represents significant financial risk. Yet many power management systems remain isolated and separate from the rest of the business enterprise. The result is poor access to incomplete information, with only limited knowledge of risk exposure. An integrated, comprehensive power management system that includes metering, software, and power quality mitigation equipment offers the most holistic, systems-based approach to managing this risk exposure.
Tags : 
financial risk, power management system, quality migration, schneider electric, pms
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
Latest generation high density and variable density IT equipment create conditions that traditional data center cooling was never intended to address, resulting in cooling systems that are oversized, inefficient, and unpredictable. Room, row, and rack-based cooling methods have been developed to address these problems. This paper describes these improved cooling methods and provides guidance on when to use each type for most next generation data centers.
Tags : 
variable density, schneider electric, data center cooling
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
Implementing prefabricated modular data centers results in well-understood benefits including speed of deployment, predictability, scalability, and lifecycle cost. The process of deploying them – from designing the data center, to preparing the site, to procuring the equipment, to installation – is quite different than that of a traditional data center. This paper presents practical considerations, guidance, and results that a data center manager should expect from such a deployment.
Tags : 
predictability, scalability, life cycle cost, schneider electric, - prefabricated data center, modular data center, data center design, data center manager
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
While enterprises continue to own and operate in-house datacenters, their use of colocation and other outsourcing services is growing fast. Demand for colocation and wholesale datacenters, with their readily available space and power, their professional operations teams and, increasingly, their rich connectivity and value-added offerings, has never been stronger. 451 Research forecasts that the operational square footage of the global colocation and wholesale sector will grow at a healthy 7% CAGR from 2017 to 2020.
Tags : 
data centers, outsourcing services, schneider electric, colocation data center, data center market
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
Colocation providers are dealing with market forces that represent both great opportunity and significant challenge – in some cases from the same development. Providers have to deal with an ever-changing set of buyers, with CFOs and COOs playing an increased role in the decision-making. And they need to address emerging trends such as the Internet of Things and cloud computing, which can have both a positive and negative impact on their businesses.
Tags : 
decision-making, emerging threats, schneider electric, - colocation data center threats, colocation provider
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
To win the colocation race you need to be faster, reliable, innovative and efficient –all while making smarter design choices that will ensure positive returns. Customers are demanding 100% uptime and always-on connectivity –be it small enterprises to large Internet Giants–and colocation providers need to meet these expectations. The growing adoption of prefabricated data centers allows just that. With the undisputed benefits of prefab modules and building components(like speed or quality),colocation providers can manage their business today, and deploy faster in the future. Chris Crosby, CEO for Compass Datacenters, is well-known for his expertise in the data center industry. From its founding in 2012, Compass’ data center solutions have used prefabricated components like exterior walls and power centers to deliver brandable, dedicated facilities for colocation providers. Prefabrication is the central element of the company’s “Kit of Parts” methodology that delivers customizable data center solutions from the core to the edge. By attending this webinar, colocation providers will: • understand the flexibility and value delivered via the use of prefabricated construction • Hear the common misperceptions regarding prefabricated modules and data center components • learn how prefabricated solutions can provide more revenue generation capability than competing alternatives • know what key things to consider when evaluating prefabricated data center design
Tags : 
data centers, colocation provider, schneider electric, - modular data centers, prefabricated data center
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 28, 2019
Attracting Investors Webinar: With more than $18 billion in M&A activity in the first half of last year alone, the colocation industry is riding the bubble of rapid growth. Colocation data center providers are being evaluated by a wide range of investors, with varying experience and perspectives. Understanding the evaluation criteria is a critical competency for attracting the right type of investor and investment to your colocation business. Steve Wallage, Managing Director of Broad Group Consulting, has led more than 30 due diligence projects and will discuss specific areas of focus including assessment of financials, management, customers, business plan, competitive positioning and future strategy and exit. By attending this presentation colocation providers will: • Hear how investors are assessing colocation providers • Understand different types of investor strategy and positioning • Explore actual case studies –success stories as well as examples where investors walked away • Walk away with a greater understanding of how to not only attract investment, but the right type of investor to propel their business growth
Tags : 
investors, schneider electric, - colocation provider, attracting investors, colo data center
    
Schneider Electric
Published By: Schneider Electric     Published Date: Apr 02, 2019
Organizations need resilience in the face of an increasingly broad and unpredictable risk landscape. This is especially true when it comes to energy and sustainability. Investors and customers alike recognize the effects of climate change and other factors that increase volatility. And the pressure these and other groups are applying to drive change can no longer be ignored.
Tags : 
economic growth, schneider electric
    
Schneider Electric
Published By: Modicon PLC     Published Date: Dec 04, 2012
Our repair technicians are capable of repairing most Modicon - Schneider Electric parts same day. Our exchange program allows us to send you a remanufactured unit while allowing you 30 days to return the failed unit for a credit.
Tags : 
    
Modicon PLC
Published By: APC by Schneider Electric     Published Date: Feb 09, 2011
In the broadening data center cost-saving and energy efficiency discussion, data center physical infrastructure preventive maintenance (PM) is sometimes neglected as an important tool for controlling TCO and downtime. PM is performed specifically to prevent faults from occurring. IT and facilities managers can improve systems uptime through a better understanding of PM best practices.
Tags : 
absolute, data protection, maitenance, ups, physical infrastructure, infrastructure, data loss protection, dlp, ponemon, it security, sensitive data
    
APC by Schneider Electric
Published By: Microsoft Office 365     Published Date: Oct 14, 2016
Champion innovation through collaboration Win or lose? Jack Welch, former chairman and CEO of General Electric, said, "If the rate of change on the outside exceeds the rate of change on the inside, then the end is near." To win in today’s fast-paced market, you need to innovate. This eBook shows you how to transform your team and organization into one that is more agile and better equipped to innovate using a modern collaboration platform. A collaborative culture helps you: Widen the ideation pipeline Accelerate time to market Deliver higher quality products and new customer experiences Fill out the form to download the eBook to learn more about how to innovate with connected collaboration.
Tags : 
innovation, team organization, collaboration platform, market, culture
    
Microsoft Office 365
Published By: Microsoft Office 365     Published Date: Nov 03, 2016
Win or lose? Jack Welch, former chairman and CEO of General Electric, said, "If the rate of change on the outside exceeds the rate of change on the inside, then the end is near." You can transform your organization to be more agile and innovative through collaboration. A collaborative culture helps you: Widen the ideation pipeline Accelerate time to market Deliver higher quality products and new customer experiences Download this eBook to learn more.
Tags : 
    
Microsoft Office 365
Published By: Schneider Electric     Published Date: Feb 08, 2018
This paper contrasts the features of medium voltage fixed circuit breaker switchgear (FCBS) and existing withdrawable circuit breaker switgear (WCBS) designs. Modern FCBS design elements that are discussed include an internal disconnect for isolation and grounding of circuits and interlocked operation among disconnect, breaker, and grounding switch for improved safety. Furthermore, features such as lower maintenance, smaller footprint, and reduced life cycle costs that result from its simpler design will be explored. By comparing the traditional ANSI WCBS technology to that of the FCBS, this paper will demonstrate that the fixed design, which has gained widespread acceptance in global markets outside the United States, is a viable alternative to the withdrawable designs.
Tags : 
fixed circuit breaker, withdrawable circuit breaker, medium voltage, switchgear, arc flash, air insulated switchgear, gas insulated switchgear, ansi
    
Schneider Electric
Published By: Schneider Electric     Published Date: Feb 26, 2018
This on demand webinar contrasts the features of medium voltage fixed circuit breaker switchgear (FCBS) and existing withdrawable circuit breaker switgear (WCBS) designs. Modern FCBS design elements that are discussed include an internal disconnect for isolation and grounding of circuits and interlocked operation among disconnect, breaker, and grounding switch for improved safety. Furthermore, features such as lower maintenance, smaller footprint, and reduced life cycle costs that result from its simpler design will be explored. By comparing the traditional ANSI WCBS technology to that of the FCBS, this paper will demonstrate that the fixed design, which has gained widespread acceptance in global markets outside the United States, is a viable alternative to the withdrawable designs.
Tags : 
fixed circuit breaker, withdrawable circuit breaker, medium voltage, switchgear, arc flash, air insulated switchgear, gas insulated switchgear, ansi
    
Schneider Electric
Published By: Epicor     Published Date: Aug 14, 2018
As an automotive parts or components manufacturer, you may be both encouraged and challenged by a growing number of trends in the automotive marketplace. From disruptive trends in product developments—such as electric vehicles, advanced assistance and safety capabilities, and driverless vehicles—to trade tariff increases, regulation changes, and higher interest rates, it’s apparent that change is in the air Download now to learn more!
Tags : 
    
Epicor
Published By: GE Power     Published Date: Jan 30, 2017
Be the first to read the 2017 top digital trend predictions for the (remove second the) the power and utility industry, and gain a competitive edge by understanding what’s next. Across the Electricity Value Network (EVN) - from generation through T&D and end user management, first movers and proactive digital adopters are far more likely to thrive in the future. Read the new Brief and learn how:
Tags : 
2017 top digital trends, power plants, utilities, power producers, electricity value network, top digital trends, power plant cyber attacks, power grids, power industry, grid operators, cloud+edge, power plant software, platform economy
    
GE Power
Published By: Eaton     Published Date: Jul 09, 2018
Our industry has made numerous technological advances designed to protect homeowners, businesses and electrical workers. That makes every fatal electrocution in the home all the more distressing. Between 2010 and 2013, the U.S. saw an estimated average of 48 electrocution fatalities associated with consumer products per year, with large and small electric appliances chief among them1. Tragedies like these can be avoided, especially when the ground fault circuit interrupter (GFCI) technologies needed to prevent dangerous events are readily available. As the principle NEMA representative at the National Electrical Code (NEC) Code-Making Panel Two, I saw public input asking for increased GFCI protection for the home during the 2017 code cycle. The code panel expanded the GFCI requirement for facilities other than dwelling units as part of section NEC 210.8(B). However, residential standards improvements were sidelined.
Tags : 
    
Eaton
Published By: Eaton     Published Date: Jul 09, 2018
Code updates happen for one main reason: safety improvement. NEC (National Electrical Code) Article 408.3 helps take electrical safety for service entrance panels to a new level. The code, updated in 2017, includes provisions to provide shock protection via panelboard barriers. The barriers protect from energized conductors on the line terminals of the main overcurrent protection device (OCPD) in a panelboard. When the main circuit breaker in a panel is turned off, line side terminals and conductors remain energized from upstream via the utility or another panelboard. With these barriers in place and the main OCPD turned off, installers are better protected when pulling wires into the panelboard. Today, all panelboards are shipped with shock-protective barriers. However, barriers are new to installation procedures, so contractors may not recognize them and accidentally throw them out—easily and often.
Tags : 
    
Eaton
Published By: Siemens     Published Date: Jun 02, 2016
Researchers of occupational electrical medical emergencies show that in a six-year period 32,840 serious but non-fatal injuries occurred, some 60% involving electric shock and 40% involving electric burns.
Tags : 
siemens, arc defense, fault-resistant, medium voltage
    
Siemens
Published By: Schneider Electric     Published Date: Sep 19, 2017
Are you facing the difficult decision to maintain or replace your aging switchgear? Upgrading can optimize your existing equipment and your budget. Learn your options and their benefits in our free white paper.
Tags : 
switchgear modernization, mv circuit breakers, lv circuit breakers, switchgear upgrades, electrical distribution equipment, schneider electric
    
Schneider Electric
Published By: Schneider Electric     Published Date: Sep 19, 2017
When your power system has aging switchgear, you need to work harder to maintain safety and reliability. But easy-to-install options are available to upgrade aging switchgear to bring safety and reliability up to modern standards. Find out how switchgear modernization works in the comprehensive "Answer Guide: Make Aging Switchgear Last Longer and Perform Better." The guide includes information like the 4 Big Wins of Modernization, embedded demonstration videos, an FAQ on how to modernize and links to other modernization resources.
Tags : 
switchgear modernization, mv circuit breakers, lv circuit breakers, switchgear upgrades, electrical distribution equipment, schneider electric, circuit breaker upgrade, obsolete switchgear
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 03, 2017
Are you facing the difficult decision to maintain or replace your aging switchgear? Upgrading can optimize your existing equipment and your budget. Learn your options and their benefits in our free white paper.
Tags : 
switchgear modernization, mv circuit breakers, lv circuit breakers, switchgear upgrades, electrical distribution equipment, schneider electric
    
Schneider Electric
Published By: Schneider Electric     Published Date: Mar 03, 2017
Don't risk unplanned downtime at your facility. Discover 10 best practices that will help you maximize the life and reliability of your switchgear. Read our free white paper.
Tags : 
switchgear modernization, mv circuit breakers, lv circuit breakers, switchgear upgrades, electrical distribution equipment, schneider electric
    
Schneider Electric
Published By: Schneider Electric     Published Date: Jun 06, 2017
If not, you are increasing the risk for costly, unplanned downtime. However, despite the importance of having a reliable flow of electricity, over half of building owners rely on reactive maintenance programs to care for their equipment. This means they wait until equipment fails completely before initiating corrective action, which is typically 3-4 times more costly than taking preventive measures. A good first step to go from being reactive to proactive is having a power system assessment performed to determine the current state and reliability of your electrical system. For more information on Power System Assessments, download our white paper, "Assessing the Health of a Facility's Electrical Power Distribution System".
Tags : 
electrical engineering services, electrical reliability, electrical risk assessment, power system assessment, risk assessment
    
Schneider Electric
Published By: Schneider Electric     Published Date: Jun 06, 2017
Could you do more for worker safety? Protective gear alone can't prevent arc flash injury. In fact, according to NFPA 70E, injuries sustained during an arc ?ash event would be reduced and survivable due to arc-rated PPE. Complying with the safe work practices required by NFPA 70E and implementing arc flash mitigation strategies through engineering controls will enhance workplace safety for employees and lower financial risk for your company. Read the white paper, "Mitigating Arc Flash Hazards", for more information.
Tags : 
arc flash, nfpa 70e compliance, electrical workplace safety, arc flash risk assessment, arc flash analysis, arc flash mitigation solutions
    
Schneider Electric
Start   Previous   1 2 3 4 5 6 7 8 9 10 11 12    Next    End
Search Research Library      

Add Research

Get your company's research in the hands of targeted business professionals.

“I am the Inspector Morse of IT journalism. I haven't a clue. D'oh” - Mike Magee